Full access to the ceiling over top of an Olympic sized pool was requested for a painting schedule of 1 month including erecting and dismantling the scaffolding. A rolling platform was built that spanned over the pool and was shifted via our steel track and caster system. The balance of the pool area was accessed via a suspended deck system. News coverage on CBC